Expansion of the Regional Road in Białe Błota: Join the Public Consultation

We are working on a solution to the transport challenges in Białe Błota along Regional Road No. 223 in Bydgoszcz County. We invite residents and stakeholders to an informational meeting, constituting the first stage of the consultation process, which will take place on 14 December. At the same time, we are continuing preparations for the construction of additional bypass roads across the region.

“Our bypass construction programme is an essential complement to the modernisation of regional roads currently being carried out. In towns and localities where it is not possible to widen existing carriageways in a way that ensures an appropriate level of safety, traffic flow and noise reduction, we build bypasses that allow heavy transit traffic to be diverted away from densely populated residential areas. We are also analysing other possible solutions,” says Marshal Piotr Całbecki.

We signed a contract with Trakt for the preparation of the conceptual design study (technical, economic and environmental feasibility study) in May this year. The scope of the investment includes:

  • construction of a dual-carriageway main road and associated engineering structures,
  • reconstruction of existing roads and construction of additional carriageways serving local traffic.

The purpose of the study is to identify possible route options for the expanded regional road and to prepare the documentation required to obtain an environmental decision for the investment. Once completed, the project will improve traffic flow on the busiest regional road in the Kujawsko-Pomorskie Region, enhance safety and reduce travel times. It will also help limit traffic noise and improve connections between Bydgoszcz and the S5 and S10 expressways.

Map showing proposed road redevelopment options.

Graphic by Regional Roads Authority (ZDW)

Route Options Prepared

Five preliminary route options have been developed. These take into account, among other factors, discussions with representatives of local governments and differing expectations regarding the future transport solution.

Option W1 (green)

This approximately 2.95 km route runs through Białe Błota along the existing alignment of Szubińska Road. It предусматриes the expansion of the road into a dual-carriageway route with two lanes in each direction for through traffic, together with additional outer lanes serving local traffic. Cycle paths and pavements are also planned.

Option W2 (red)

This approximately 3.28 km route starts at the roundabout at Ofiar Hitleryzmu Street and runs north of Białe Błota, parallel to the railway line. After crossing over a railway siding, it continues towards Szubińska Road, joining it near Kapliczna Street.

Option W3 (blue)

At approximately 4.12 km in length, this option is located furthest north of Białe Błota. It crosses the railway line twice and, like Option W2, terminates near Kapliczna Street.

Option W4 (yellow)

This route is approximately 3.45 km long. Its alignment is similar to that of Option W2, but it crosses the railway line twice. It is situated between Options W2 and W3.

Option W5 (purple)

This route is approximately 2.96 km long and follows a similar alignment to Option W1. The key difference concerns the urbanised section of Białe Błota, where the construction of an approximately 660-metre tunnel beneath Szubińska Road is proposed. Through traffic would travel within the tunnel on two carriageways with two lanes in each direction. Above the tunnel, road infrastructure for local traffic, pedestrians and cyclists would be reinstated.

The alignments of all proposed options can be viewed on the Trakt website (www.trakt.eu/bialeblota/#blog).

The information meeting will take place on Monday, 14 December, at 4:00 p.m. in the auditorium of Marian Rejewski Primary School in Białe Błota, ul. Czysta 1A, Building B.

Following the meeting, residents and stakeholders will have one month to submit comments and opinions regarding the proposed solutions. A dedicated feedback form will be made available and may be submitted electronically or by post.

The study prepared by Trakt will identify possible route options for the road, taking into account existing and planned land use. It will also serve as the basis for further design work and efforts to obtain the environmental decision required for the project. The cost of preparing the feasibility study, together with the documentation required for environmental approval, exceeds PLN 1.7 million. Work on this stage of the project will be completed in 2028.

The Regional Roads Authority, which assumed responsibility for the project after it was previously coordinated by the Municipality of Białe Błota, is now leading the initiative. Bydgoszcz County and the City of Bydgoszcz are also partners in the project.

Work Continues on Additional Bypass Roads

This project forms part of the Marshal’s programme for the construction of new roads and bypasses. Work on other projects is also continuing. Recent milestones include:

  • the opening of Phase II of the Mogilno Bypass;
  • obtaining the road investment permit for the bypass in Sępólno Krajeńskie;
  • ongoing construction of the Trląg Bypass on Regional Road No. 255;
  • obtaining the environmental decision required for the construction of the Radzyń Chełmiński Bypass, while continuing documentation work for the selected route option and carrying out geological surveys;
  • preparations for a tender procedure for the construction of the Brodnica Bypass (coordinated with the municipal government, which will expand the local water supply network);
  • signing a contract for the corridor study of a new regional road linking the boundaries of Toruń with Regional Road No. 569 in the Municipality of Lubicz.

Kujawsko-Pomorskie Bypass Construction Programme

The regional self-government is steadily increasing funding for design and construction work under the regional bypass construction programme. The programme includes bypass routes with a combined length of more than 70 kilometres. Implementation over the coming years will require investment of approximately PLN 1 billion.

Under our Regional Programme for 2021 – 2027, a record allocation of EUR 136 million has been designated for the expansion and modernisation of road infrastructure. In addition, PLN 170 million has been secured from national government funding for three bypass projects: Brodnica, Rypin, and Tuchola.

See also Bypasses Will Improve Road Safety and Traffic Flow in the Region